Scroll Top

Mission Health

Mission Health CEP Expansion & BAS Upgrade

An expansion of the existing campus CEP to support the existing campus and allow for hospital expansion, with a new CEP building at ~16,700 SF.  The scope of work included the installation of new generators, boilers, chillers, cooling towers, and switchgears. This new CEP tied into the existing on-site to work together to power the Mission Health Hospital Campus.

Complete upgrade of the 1,000,000+ SF campus wide building automation system (BAS).

Project Details

MARKET:
Healthcare

OWNER
HCA Healthcare

CLIENT:
Mission Health

SIZE:
16,700SF + 1M SF

DELIVERY:
Design-Build

LOCATION:
Asheville, NC