Mission Health CEP Expansion & BAS Upgrade
An expansion of the existing campus CEP to support the existing campus and allow for hospital expansion, with a new CEP building at ~16,700 SF. The scope of work included the installation of new generators, boilers, chillers, cooling towers, and switchgears. This new CEP tied into the existing on-site to work together to power the Mission Health Hospital Campus.
Complete upgrade of the 1,000,000+ SF campus wide building automation system (BAS).
Services Included
Project Details
MARKET:
Healthcare
OWNER
HCA Healthcare
CLIENT:
Mission Health
SIZE:
16,700SF + 1M SF
DELIVERY:
Design-Build
LOCATION:
Asheville, NC