Regional Data Center, Maiden, NC

Challenge:
- Upgrade the generator rooms, data halls and high-temp chiller rooms of a 400,000-square-foot data center on a fast track construction schedule
Scope:
- Provide, fabricate and install the duct, plenums, and intake and exhaust louvers associated with generator combustion and cooling air
- Install generator exhaust gas system
- Design, fabricate, construct and test mockup system to troubleshoot and test the proposed data hall cooling system
- Install cooling fans and associated duct for the server racks in the data halls
Project Highlights:
- Provided design feedback during the mockup stage, which eliminated potential construction and design problems, expedited the construction schedule and minimized costly rework
- Exceeded the expected construction schedule while working in a crowded environment
- All systems were fabricated and constructed off-site in our fabrication facility, then dissembled and installed on-site to minimize work congestion in the space